QR Code QR Code
Post Offer Free
Jiangsu Bailey Steel Bridge Co.,Ltd.
Jiangsu Bailey Steel Bridge Co.,Ltd.  

Gold Index: 18668

You are here: home  > HD200 Bailey Bridge  > Cases  > Double Lane Bailey Bridge

Double Lane Bailey Bridge 

Payment Terms: T/T,L/C 
Place of Origin: Jiangsu, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: HD200
Production Capacity: 2500 tons / month
Means of Transport: Ocean

Standard: ASTM, BS, GB Grade: Q345B Model Number: JSBLGQ-HD200-046

Specifications

1 Less expense, wide usage 
2 Provide engineer guidance at site 
3 Factory Provid Directly 
4 use unskilled labor to install 

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges. 

The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

 

Span Construction-Load Table ---Extra Single Lane (W=4200mm)
      SPAN-ftHS-15HS-20HS-25
30SSSSSS
40SSSSSS
50SSSSSS
60SSSSSS
70SSSSSSR
80SSSSRSSR
90SSRSSRSSR
100SSRSSRSSR
110SSRSSRDS
120SSRDSDSR1
130DSDSR1DSR2H
140DSR1DSR2HDSR3H
150TSTSR2DSR2HDSR4H
160DSR2HDSR2HTSR2
170TSR2TSR2TSR3
180TSR2TSR3TSR3H
190TSR3HTSR3QSR4
200QSR4TSR3QSR3 QSR4




Span Construction-Load Table ---Double Lane (W=7350mm)
      SPAN-ftHS-15HS-20HS-25
30SSSSSS
40SSSSSS
50SSSSSSR
60SSSSRSSR
70SSRSSRDS
80SSRDSDSR1
90SSRHDSR1DSR2H
100DSR1DSR2HTSR2
110DSR1DSR2QS
120TSDSR2HTSR2
130DSR2HTSR2TSR3
140TSR2TSR3TSR3H
150TSR3HTSR3HQSR4
160QSR4QSR4QSR4
170QSR4QSR4
180QSR4





1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc.                                          
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc.



 

 

bigPhoto
 Ms. lanny
manager
Tel: 0086-511-86095066
Fax: 0086-511-88881212
Mobile: 183 4471 7602
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Jiangsu Bailey Steel Bridge Co.,Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Zhenjiang
Province/State: Jiangsu
Country/Region: China (Mainland)

lanny:   qq

You May Like: